PRAYAGRAJ, Nov. 26 -- Prayagraj is set to implement a transformative infrastructure project to combat the city's chronic waterlogging issues. Authorities are constructing a mini dam directly on the Ghaghar Nala (drain), a strategic initiative designed to protect over 10 municipal corporation wards of the city and provide relief to approximately three lakh residents. As per CD Mishra, project manager at Construction and Design Service (C&DS), an executing body of UP Jal Nigam, while dams are traditionally constructed on large rivers, this unique engineering approach specifically targets urban flooding. "The project, estimated at Rs 20 crore, seeks to provide a permanent solution to the recurring distress faced by citizens during monsoon seasons. Currently, when heavy rainfall causes the Ghaghar Nala to overflow, drainage becomes obstructed, leaving local neighborhoods submerged and daily life paralysed," he said. Mishra confirmed that the tender process was complete, with construction scheduled to commence in the first week of December. "The facility will function by closing its gates during heavy rainfall to regulate waterlogging in a controlled manner. Once collected, the water will be discharged into the Yamuna through a dedicated pumping station," he added. The infrastructure will have five large-capacity pumps, each of 350 horsepower capacity. According to project specifications, this pumping station is designed to handle a discharge rate of 14,000 liters per second. It may be recalled that continuous rainfall for nearly a week in August this year resulted in widespread waterlogging, disrupting the power supply and forcing residents to stay indoors for days. The downpour had caused severe waterlogging in several localities, including Daraganj, Shivkuti, Chota Baghada, Johnstonganj, Baihrana, Allahpur, George Town, Tagore Town, Ghaus Nagar and Kareli, resulting in immense inconvenience for commuters and residents....