ALEXANDRIA, Va., Nov. 3 -- United States Patent no. 12,787,430, issued on Nov. 3, was assigned to SAMSUNG ELECTRONICS Co. LTD. (South Korea).

"Cell architecture with improved backside power rail through engineering change order" was invented by Jintae Kim (Clifton Park, N.Y.) and Kang-ill Seo (Springfield, Va.).

According to the abstract* released by the U.S. Patent & Trademark Office: "A semiconductor device includes: a plurality of cells including 1st cells arranged in a 1st row of a layout of the semiconductor device; and a 1st backside power rail and a 2nd backside power rail disposed below the 1st cells, extended in a 1st direction, and arranged in a 2nd direction intersecting the 1st direction, wherein the 1st backside power has a 1...