Atlanta, March 26 -- THOMASVILLE, CITY OF has issued a solicitation notice (PE-66084-NONST-2026-000000054) titled ‘2026 Bridge & Box Culver Erosion Control’. Notably, the event starts on March 25 and ends on April 28.

Further, the description states, “¿ This project is based on a deficiency report that¿s provided by GDOT to the City every two years. The project will provide erosion stabilizations and streambank protections on the City¿s Box Culverts and Bridges. This includes work on the box culverts on Cairo Road, South Pinetree Boulevard, Clay Street, MLK at Felix Street, Edgewood Drive, and Cassidy Road. Additionally, erosion control will be provided on the MLK and Chatham Road Bridges. This work includes the installation of rock check ...