WASHINGTON, Aug. 4 -- Pipeline and Hazardous Materials Safety Administration has issued a rule called: Hazardous Materials: Adoption of Department of Transportation Special Permit 14175.

The rule was published in the Federal Register on Aug. 4 by Paul J. Roberti, Administrator, Pipeline and Hazardous Materials Safety Administration.

Summary: This final rule removes undue regulatory burdens by adopting the provisions of U.S. Department of Transportation (DOT) special permit (SP) 14175 to authorize a 10-year requalification period and the ultrasonic examination (UE) testing method for DOT specification 3A and 3AA cylinders in flammable and non-flammable, nonpoisonous gas service. This adoption reflects advances in testing technology and wil...