GENEVA, April 28 -- VCONSTRUCT PVT LTD (Unit 1, Level 5, Tower B 1, Magarpatta City Sez, Village Hadapsar, Taluka HaveliPune 411013) filed a patent application (PCT/IN2025/051670) for "SYSTEM FOR GENERATING WORK BREAKDOWN STRUCTURE BASED ON BUILDING INFORMATION MODELING" on Oct 15, 2025. With publication no. WO/2026/083450, the details related to the patent application was published on Apr 23, 2026.

Notably, the patent application was submitted under the International Patent Classification (IPC) system, which is managed by the World Intellectual Property Organization (WIPO).

Inventor(s): SONTAKKE, Suraj (B802, Gagan Utopia, Keshav Nagar, MundhwaPune 411036)

Abstract: The present invention is a system for generating work breakdown structu...