GENEVA, March 18 -- ORACLE INTERNATIONAL CORPORATION (500 Oracle ParkwayM/S 5OP7Redwood Shores, California 94065) filed a patent application (PCT/US2025/025077) for "AI-ASSISTED PROJECT CHANGE ORDER GENERATION" on Apr 17, 2025. With publication no. WO/2026/054819, the details related to the patent application was published on Mar 12, 2026.

Notably, the patent application was submitted under the International Patent Classification (IPC) system, which is managed by the World Intellectual Property Organization (WIPO).

Inventor(s): MANELLORE, Roshan (500 Oracle ParkwayM/S 5OP7Redwood Shores, California 94065), SAN, Pyay Aung (500 Oracle ParkwayM/S 5OP7Redwood Shores, California 94065), VINEELA, Mannepalli (500 Oracle ParkwayM/S 5OP7Redwood Sh...