Big Relief for Bengaluru Commuters: Yellow Line Metro Gets Final Trainset; Peak-Hour Wait Time to Drop to Just 5 Minutes
India, July 28 -- Bengaluru Metro commuters travelling on the Yellow Line could soon experience shorter waiting times and smoother journeys as the Bengaluru Metro Rail Corporation Limited (BMRCL) moves closer to completing the corridor's planned fleet. The 15th and last six-carriage train set has finally reached the Hebbagodi depot, where the carriages are being equipped with couplings and gangways prior to formation of the train and sent to IBL (Inspection Bay Line).
The 19.75-km Yellow Line links R.V. Road to Bommasandra with important employment areas like the Central Silk Board, Electronic City, and Bommasandra. The line also offers a junction between Yellow Line and Green Line at R.V. Road. Once all 15 trainsets start operating, the...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.