ACME Solar Commissions 53.63 MW / 300 MWh Battery Storage Phase At Rajasthan FDRE Project
India, Sept. 15 -- India's largest renewable energy producer, has switched on the first phase of battery storage at its Rajasthan FDRE site 53.63 MW/300 MWh, with the rest of the project still under construction. It's a modest number on its own, but it lands right as the company is trying to hit an upgraded full-year storage target it set only a few months back. What happens with the remaining capacity at this site will say a lot about how that broader plan is actually tracking.
Shares of Acme Solar Holdings Ltd are trading at Rs. 414.35, up 3.00 percent on Tuesday. The stock touched the intraday high of Rs. 416.90 after opening at Rs. 402.15 before slipping to a low of Rs. 402.15. The company commands a market capitalization of Rs. 29,...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.