United States, July 1 -- TransCore announced the successful launch of open-road all-electronic tolling (AET) at the Delaware River Joint Toll Bridge Commission (DRJTBC)'s New Hope-Lambertville (U.S. Route 202) Toll Bridge. This marks the DRJTBC's first operational open-road AET conversion among its seven legacy toll-supported crossings, a key step in its broader tolling modernization program.With the system now operational, TransCore is enabling DRJTBC's transition from cashless tolling using existing toll plaza infrastructure to full open-road AET. By eliminating traditional toll plaza infrastructure, motorists can now travel through the crossing without stopping, enhancing roadway safety and reducing long-term maintenance requirements whi...