Bangladesh, Aug. 18 -- Bangladesh based M/s. Create Frame has secured contract from Bangladesh Railway for At SSAE/Works/KRF Section: Construction of RCC drain cum protection wall in between SRG-BXX Section at Km 297/34-(Left side), 298/7-8 (Right side) (Total length-400 feet) to protect land slide from hilly area as per approved drawing. . The value of the contract is worth 5342960 BDT .

Published by HT Digital Content Services with permission from Pivotal Sources....