Poland, Oct. 29 -- Poland based Budimex S.A. has secured contract from Generalna Dyrekcja Drog Krajowych i Autostrad for Construction work - Reconstruction of the A2 motorway on the section of the Lodz Polnoc junction (without the junction) - the border of the Lodz and Masovian Voivodeships with additional lanes, Section A from km 365,261 to km 389,678, carried out as part of the project entitled: Widening of the A2 motorway on the section of the Lodz Polnoc junction (without the junction) - the border of the Lodz Voivodeship and Masovian Voivodeship for additional traffic lanes and Renovation of the A2 motorway on the A0 section (). The value of the contract is worth 368427437.24 PLN.
Published by HT Digital Content Services with permissi...