China, Oct. 14 -- China based ASM Front-End Manufacturing Singapore Pte. Ltd. has secured contract from MCL Electronic Materials (Zhengzhou) Co.,Ltd. for Procurement of 0821-264MSKZZ1204 MCL Electronic Materials (Zhengzhou) Co., Ltd. Annual Production of 3.6 Million Pieces of 8-inch Semiconductor Specialty Silicon Polished Wafer Project-POLY Back-sealing Furnace Procurement(1). The value of the contract is not disclosed.

Published by HT Digital Content Services with permission from Pivotal Sources....