Railway tunnel breakthrough advances Uttarakhand mountain connection
New Delhi, Nov. 29 -- Construction of the Rishikesh-Karnaprayag railway in Uttarakhand reached another milestone on November 27 when excavation teams connected the two sections of Tunnel 14 in Rudraprayag district. The tunnel runs for 6.59 kilometres between the Sumerpur and Marora sides of the project.
The Railways Ministry reported that construction included a section beneath inhabited areas where loose ground required specialised excavation and stabilisation. Additional reinforcement was installed near the opposite portal.
The route is intended to improve rail connectivity within Uttarakhand's mountainous terrain. Tunnelling reduces the need for lengthy surface alignments, although it also requires careful attention to slope stabilit...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.