Export of Power to Nepal Approved
New Delhi, Sept. 15 -- Approval has been given for upto 600MW of export through Muzaffarpur - Dhalkebar 400 kV D/c line and upto 54 MW through Tanakpur - Mahendranagar 132 kV S/c line. The quantum of power to be exported from January 2027, will be reviewed in December,2026.
The recent floods have caused significant damage to hydropower infrastructure in Nepal, reducing its domestic power generation capacity and creating an additional requirement for electricity. The approval will help Nepal meet its power requirements during this difficult period and further strengthen the close and longstanding energy cooperation between India and Nepal.
Published by HT Digital Content Services with permission from New Delhi Times....
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.