New Delhi, Dec. 13 -- The Delhi Metro Rail Corporation Limited (DMRC) commenced construction work on the all-important Saket G Block- Lajpat Nagar corridor of Phase-IV. This is the first section beyond the Phase-IV's priority corridors where physical work has been started.
The First Test Pile and Ground Breaking Ceremony on the Lajpat Nagar to Saket G-Block Corridor of the Golden Line (Line-11) was held at Pushpa Bhawan near Saket, marking a historic milestone in the expansion of Delhi's metro network.
The occasion was graced by Dr. Vikas Kumar, MD/ DMRC and other senior officials from DMRC, along with officials from Rail Vikas Nigam Limited (RVNL), the contractor for this section.
The Lajpat Nagar to Saket G-Block Corridor will be ele...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.