Bhubaneswar, Jan. 1 -- The Union Cabinet, chaired by Prime Minister Narendra Modi, has approved the widening and strengthening of a stretch of National Highway-326 (NH-326) in Odisha.
The project involves upgrading the existing two-lane highway to a two-lane road with paved shoulders from Km 68.600 to Km 311.700 and will be implemented under the National Highways (Original) [NH(O)] programme on Engineering, Procurement and Construction (EPC) mode.
The total capital cost of the project has been approved at Rs. 1,526.21 crore, which includes a civil construction component of Rs. 966.79 crore. The project is targeted for completion within 24 months from the appointed date for each package, followed by a five-year defect liability and maint...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.