Sagar directs PDD to ensure adequate power supply during winter
Srinagar, Nov. 7 -- Alusteng grid station capacity proposed to be raised from 320 MVA to 475 MVA at a cost of Rs 56.78 crore; amnesty scheme under consideration
SRINAGAR: Minister for Power Development Department (PDD) Ali Mohammad Sagar on Saturday directed officials to minimise unscheduled power cuts and ensure adequate electricity supply during the winter months, as he reviewed the department's preparedness at the 220/132/33 KV Grid Station in Alusteng.
During the visit, Sagar assessed the functioning and existing capacity of the grid station, power distribution arrangements and measures being taken to maintain reliable electricity supply, particularly in Srinagar and Ganderbal districts.
He directed officers to ensure that consumer...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.