Residents seek resumption of bridge work in Ningli Bala, Tarzoo
Sopore, Aug. 25 -- Residents of Ningli Bala in Tarzoo area of Sopore have urged the administration and Roads & Buildings (R&B) Department to resume work on a long-pending bridge connecting the locality with Sopore town.
Locals said the bridge, being constructed under the NABARD scheme, was halted due to a rise in water levels. However, they claimed that despite water levels receding significantly, work on the project has not resumed, causing inconvenience to residents.
They said schoolchildren are facing difficulties commuting, patients are struggling to access healthcare facilities and elderly people are finding it hard to reach nearby mosques. A temporary wooden footbridge erected by locals has reportedly deteriorated and now poses a ...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.