KPDCL announces power shutdowns across Kashmir from Nov 14 to 21
SRINAGAR, Nov. 12 -- The Kashmir Power Distribution Corporation Limited (KPDCL) has announced scheduled power shutdowns on various 33 kV transmission lines between November 14 and 21, which will affect several areas across Kashmir.
According to the Chief Engineer, power supply to KP Bagh, Soiteng PHE, Mehjoornagar, Jawaharnagar, Kursoo Rajbagh, Rajbagh, Zero Bridge, Gogjibagh, Museum and Lalmandi will remain affected from 9 am to 3 pm on November 14 and 19 due to shutdown of the 33 kV KP Bagh line.
Similarly, power supply to Landoora, Hermain, DK Pora, Hajipora, Nadigam, Mantribugh, Chakoora, Ratnipora, Dangam, Wangam, Wachi, Babapora and Safnagri will remain affected from 9 am to 3 pm on November 16 and 21 due to maintenance work on th...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.