
Mumbai, Nov. 27 -- The two elevated corridor projects, designed to ease congestion and improve connectivity across Varanasi, attracted strong bidder interest ahead of implementation under the hybrid annuity model.
The National Highways Authority of India (NHAI) has received 32 bids for two major elevated corridor projects in Prime Minister Narendra Modi's Varanasi Lok Sabha constituency, underlining strong developer interest in infrastructure aimed at easing urban congestion and improving regional connectivity.
The Ganga and Varuna elevated corridors, with a combined length of about 89.2 km, were approved by the Cabinet Committee on Economic Affairs in July 2026. Together, they will connect key sections of the Varanasi Ring Road with National Highways 19 and 31, improving access to transport hubs, pilgrimage destinations and economic centres across eastern Uttar Pradesh.
The national highways developer, in an official statement on Friday, said that the 43.2 km Varuna Elevated Corridor received eight bids for Package I and seven bids for Package II, while the 46 km Ganga Elevated Corridor attracted eight bids for Package I and nine bids for Package II.
Varuna Corridor
The Varuna Elevated Corridor will connect NH-31 with the Varanasi Ring Road along the River Varuna. The project, to be implemented under the hybrid annuity model (HAM), carries an estimated cost of Rs.109.98 billion and comprises a predominantly elevated six- to four-lane corridor with flyovers, ramps, loops and service roads.
A key component of the Varanasi Decongestion Plan, the corridor is expected to improve connectivity between NH-31 and Kashi Railway Station while enhancing access to Varanasi Airport, Varanasi Junction, Deen Dayal Upadhyaya Junction, Varanasi City Railway Station, Ramnagar Port, Sampurnanand Sanskrit University, the city's ghats and the adjoining Chandauli region.
Designed for operating speeds of 80-100 kmph, the project is expected to reduce travel time between NH-31 and Kashi Railway Station from about 40 minutes to 20 minutes. The corridor is also expected to improve road safety, lower vehicle operating costs and facilitate smoother movement of passenger and freight traffic.
The project will strengthen multimodal connectivity by improving access to the Chandauli socio-economic zone, key logistics nodes and transport networks. NHAI said it would support more efficient movement of agricultural produce, industrial goods, construction materials and minerals across the region.
Ganga Corridor
The proposed 46 km six-lane Ganga Elevated Corridor will connect NH-19 with the Varanasi Ring Road along the River Ganga at an estimated cost of Rs.144.48 billion under the HAM model.
The project includes a six-lane elevated carriageway, a 910-metre cable-stayed bridge, a 1.32 km extradosed bridge-cum-foot overbridge, as well as ramps, link roads and service roads.
Conceived as a high-speed urban mobility corridor, the project aims to improve connectivity between NH-19, the Varanasi Ring Road, Ramnagar, Banaras Hindu University (BHU) and other major destinations. Travel time on the corridor is expected to fall from around 60 minutes to 20 minutes, while journeys between NH-19 and Kashi Railway Station are projected to be shortened from about 50 minutes to 25 minutes.
Aligned with the PM Gati Shakti National Master Plan, the corridor will improve access to railway stations, Lal Bahadur Shastri Airport, Ramnagar Inland Waterways Authority of India (IWAI) Port and key cultural landmarks, including Kashi Vishwanath Temple, Namo Ghat, Ramnagar Fort and the ghats of Varanasi.
NHAI said the two projects are intended to address rising traffic volumes in Varanasi by improving connectivity between highways, the ring road and major urban destinations. Beyond reducing congestion, they are expected to support tourism, pilgrimage traffic and freight movement while contributing to economic growth across Varanasi and the wider eastern Uttar Pradesh region.
Published by HT Digital Content Services with permission from Infrastructure Today.