India, Sept. 26 -- The Government of India has issued a release:

Project: Construction of 4-Lane Road Over Bridge in lieu of LC Gate No. 3

Location: Guntur-Nambur (Guntur-Krishna Canal section), connecting Inner Ring Road, Gorantla Village, and Bus Stand Road

Estimated Cost: Rs.108 Crore (100% funded by Railways)

Length: 668 Metres

Land Requirement: 2.9 Acres

Benefits: Elimination of gate detentions, seamless flow of city vehicular traffic, fuel savings, enhanced train punctuality, and upgraded urban safety.

In a major incentive to urban mobility and rail safety under the vision of "New Railways, New Andhra Pradesh," the foundation stone for a four-lane Road Over Bridge (ROB) between Guntur and Nambur railway stations was laid today ...