Cabinet clears Rs.1,794 cr Ganga water project
PATNA, Nov. 26 -- The state cabinet on Wednesday approved the urban development and housing department's (UDHD) ambitious plan to supply potable water from the Ganga river to every household in the state capital. A sum of Rs.1,794.32 crore will be spent on the project under the Centrally-sponsored AMRUT 2.0 scheme.
This was among 34 proposals cleared by the cabinet at its meeting chaired by chief minister Samrat Choudhary. It marked the first time the Bihar cabinet functioned in fully electronic mode. Additional chief secretary (cabinet) Arvind Kumar Choudhary said the Patna water supply scheme will cover all 75 wards of Patna municipal corporation and aims to provide piped connections to 2,18,585 households. Key components include construction of an intake well near the abandoned Pipa Pul in Danapur diara on the Ganga, a second intake well near Phirdausia Ghat in Didarganj, two water treatment plants of around 350-355 MLD capacity (one at Diara Danapur Shahjahanpur and another at Sukwarpur), 45 new water towers ranging from 1,000 to 4,250 KL capacity, completion of 13 partially built towers, integration of five existing ones, nearly 98 km of clear water rising mains, close to 2,000 km of distribution network, and two centralised SCADA systems.
Patna has long struggled with an ageing and inadequate water supply network that relies heavily on groundwater extraction through tube wells. Pipelines laid decades ago have not kept pace with the city's growth. Earlier plans under schemes such as JNNURM and previous iterations of surface water projects from the Ganga faced repeated delays, cost revisions and incomplete coverage.
In a related move to strengthen surface water-based supply in south Bihar, the cabinet approved revision of the cost of the Sone river drinking water project for Aurangabad, Dehri and Sasaram. The original administrative approval of Rs.1,347.32 crore has been revised upwards to Rs.2,014.65 crore following detailed technical scrutiny and design modifications recommended by IIT Roorkee and IIT Delhi. Work on modernising the Dehri anicut, intake wells, pump houses, water treatment plant, storage structures, pipeline network and power arrangements is under way. The project, which started on September 5, 2024, is scheduled for completion by March 4, 2027.
The cabinet also approved the constitution of a five-member Bihar Economic Advisory Council on the lines of the Central government's body. To accelerate industrial development, the cabinet cleared acquisition of land for three new industrial areas through the Bihar Industrial Area Development Authority. In Nalanda's Islamur block (mouza Brahgama), 564.37 acres will be acquired at an estimated cost of Rs.382.23 crore. In Samastipur's Khanpur block, 480 acres across three villages (Sivaisinghpur, Nattudhar and Vishnpur Abhi) will cost Rs.261.92 crore. In Sheikhpura's Chewara block, 250 acres in three villages will be acquired for Rs.62.37 crore after cancelling an earlier resolution. The combined outlay of around Rs.707 crore is expected to create fresh investment and employment opportunities in these districts.
Among other decisions, the cabinet approved creation of 64 posts (teaching and non-teaching) in IGIMS, Patna....
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.