Fadnavis defends tree-felling, accuses Oppn of 'fake narrative'
MUMBAI, Oct. 26 -- Amid protests by local residents, environmental groups and opposition leaders against the state forest department's permission to fell over 32,000 trees for the Gujarat-based Torrent Power's Rs 13,500-crore, 3,000-MW hydroelectric project in Karjat, chief minister Devendra Fadnavis on Sunday accused opposition leaders of pushing a "fake narrative" as part of an "anti-Maharashtra campaign".
The CM said that due diligence had been done and the project had received clearances in accordance with the prescribed rules and regulations. Acknowledging that local residents might have grievances, he said their concerns would be taken into consideration but defended the pumped storage hydropower project as a source of clean energy that would help reduce pollution.
"Our solar power generation capacity has increased, but peak-hour electricity demand comes after solar generation hours. If we rely on coal-based electricity to meet this demand, it will cause a lot of pollution, to offset which, we would need to plant 280 million trees," he claimed. "If we were to generate the entire 3,000 MW through thermal power, the pollution caused would be equivalent to that produced by four million vehicles."
Addressing the environmental angle, Fadnavis said a water body would be created at the site where the trees were felled since the project was a hydropower one. "Torrent Power has provided the forest department with three times the land being diverted for the project, and will also plant 90,000 trees around the water body at its own expense," he said. He also maintained that the project site was 16 km from the Bhimashankar sanctuary and 20 km from the Bhimashankar temple. Reiterating that the government would consider local concerns, he said no one would be left dissatisfied.
Given that the project is being executed by a Gujarat company, the CM stressed that the investment and employment opportunities would be for Maharashtra, and the state would be the primary beneficiary of the project. "With several development projects coming up, the state needs clean energy to meet its growing power requirements," he said. "There is no reason to oppose a project that generates electricity without causing pollution. The Opposition should refrain from politicising the issue by creating a fake narrative which is anti-Maharashtra."
Meanwhile, adding his voice to those of Shiv Sena (UBT) leader Aaditya Thackeray and NCP (SP) MLA Rohit Pawar, Maharashtra Navnirman Sena (MNS) chief Raj Thackeray will visit Karjat on October 28 to meet affected residents. "He will guide them on how to take the agitation forward and hold discussions with gram panchayats opposing the project," said MNS Mumbai chief Sandeep Deshpande.
The project, being executed in Saidongar, Kotwal Khalati and Pali requires the hacking of over 32,000 trees on 370ha of land, which includes forest land. After the tree-cutting began a couple of days ago, locals launched protests, the videos of which went viral. Opposition leaders have backed them, pointing out the environmental consequences for Karjat, Mumbai and Pune....
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.