Power glitch in Metro rake disrupts line 2 near Yerawada
India, Nov. 23 -- A technical fault in the internal power supply system of a Pune metro train disrupted services on the Vanaz-Ramwadi corridor (line 2) on Sunday, forcing the operator to run trains on a single line between the RTO and Ramwadi for nearly two hours.
The incident occurred at around 11.38 am when a train travelling from Ramwadi towards Vanaz developed a technical fault near Yerawada metro station. The affected rake was taken out of service for inspection, while the metro operator switched to single-line operations from 11.55 am to minimise disruption to other services.
Services on line 2 were reported to be operating normally after two hours at around 1.35 pm.
According to Pune Metro officials, the fault was confined to th...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.