SANGRUR, April 9 -- The Punjab and Haryana high court has issued notices to the Punjab government and the Centre on a Public Interest Litigation (PIL) challenging the construction of a Rs.54.76 crore railway overbridge (ROB) in Dhuri.
Acting on the petition filed by a local resident, Amritroop Singh Dhaliwal, the court has set April 22 as the next date of hearing.
The petitioners alleged that the ROB being constructed over the Sheron distributary, passing through the residential area at Dhuri, will lead to cutting down of more than 250 fully-grown trees and also that the cost of construction of the overbridge is higher than the earlier proposed railway underbridge (RUB).
As per the plea, the ROB is estimated to cost Rs.54.76 crore, whe...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.