India, April 25 -- Delhi recharged more water than it extracted from the ground in 2025, showing a significant improvement in groundwater extraction with an extraction rate of 92.1%, according to the latest annual Central Groundwater Board (CGWB) report.
The report, dated November 2025 but uploaded recently, shows Delhi extracted 0.32 billion cubic metres (bcm) of groundwater in 2024-25 but was able to recharge 0.38 bcm back.
For context, Delhi's extraction rate was 100.77% in 2023-24, 99.13% in 2022-23, and 98.16% in 2021-22. Groundwater extraction over 100% means more water is being extracted than recharged, while a lower rate indicates groundwater is being left unutilised and more is being recharged. The extraction rate was 101.4% in...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.