After string of mishaps, MMRDA tightens Metro 9 safety
India, Sept. 24 -- The Mumbai Metropolitan Region Development Authority (MMRDA) has ordered an immediate strengthening of safety measures along the under-construction Metro Line 9 following a series of incidents that have resulted in fatalities and serious injuries.
Similar measures will be implemented along Metro Line 4 and other under-construction metro corridors, according to officials aware of the developments, amid growing public scrutiny over safety at metro worksites.
The decision to step up safety measures on Line 9 came after the latest incident on September 20, when a 23-year-old man suffered severe head injuries after a cement block fell on him from an elevated construction site at Kashimira.
On Wednesday, MMRDA commissioner...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.