Goa, April 18 -- The Goa State Infrastructure Development Corporation Limited (GSIDC) has released a detailed schedule of traffic blocks on the stretch from Power House Circle Davorlim to Ravanfond Junction in South Goa for ongoing girder launching works.
As per the schedule, vehicular movement will be halted on key routes at specific intervals between April 20 and April 24, 2026:
Authorities have advised motorists to plan their journeys in advance and use alternative routes to avoid inconvenience during the scheduled closures. The temporary traffic restrictions are part of ongoing infrastructure development works aimed at improving connectivity in the region.
The Traffic Police Inspector has urged the public to cooperate with authorit...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.