Temporary bridge removal cuts off Khotang's direct transport link with Tarai
Khotang, May 18 -- The removal of Bailey bridges at Phoksingtar and Bansilaghat has again cut off direct transport connectivity between Khotang district and the southern plains, disrupting the supply of goods and affecting local businesses.
As the monsoon approaches, the temporary bridges installed during winter are dismantled every year due to rising water levels in the Sunkoshi river. The cycle of installation and removal continues to cost millions of rupees annually in the absence of permanent infrastructure.
The Phoksingtar bridge under the Sagarmatha Highway connects Lichkiramche in ward 9 of Khotehang Rural Municipality, Khotang, with Anptar in ward 5 of Rautamai Rural Municipality, Udayapur. The temporary Bailey bridge came into ...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.