Power restored in much of flood-hit Rasuwa and Nuwakot, but pockets remain dark
Kathmandu, Sept. 6 -- The restoration of electricity in much of flood-hit Rasuwa and Nuwakot has provided a major boost to search, rescue and relief operations, while remote settlements remain without access to the national grid, officials said.
The flash floods along the Bhotekoshi River on August 26 swept away power pylons and damaged other hydropower infrastructure, leaving thousands of households without electricity across Rasuwa, Nuwakot and Dhading. Thirteen hydropower projects, both operational and under construction, were also damaged.
Officials at the Nepal Electricity Authority said power had been restored in more than 75 percent of the affected areas.
"Even with 300 megawatts of generation offline, we have managed to route p...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.