Second Saraighat Rail cum Road Bridge to Transform Multimodal Connectivity across Brahmaputra with Doubling of Agthori-Kamakhya Section to Strengthen Northeast
MALIGAON, Sept. 23 -- Northeast Frontier Railway (NFR) is undertaking the Second Saraighat Rail-cum-Road Bridge Project including doubling of the railway track between Agthori and Kamakhya stations, which is set to become a major addition to Assam's transportation infrastructure. The project will strengthen rail and road connectivity across the Brahmaputra, augment transportation capacity for Guwahati and support the wider connectivity requirements of the Northeastern region. The existing Saraighat Bridge was completed in September 1962, with the first engine crossing the bridge on 23 September 1962. For more than six decades, it has served as a vital link between the northern and southern banks of the Brahmaputra and as an important gatewa...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.