WAPDA chief reviews progress on Tarbela's fifth extension projectPublished on: May 26, 2026 9:24 AM
Pakistan, May 26 -- Chairman WAPDA Lt Gen Muhammad Saeed (Retd) was briefed about the progress about the Projects during his visit to Tarbela Dam. The day-long visit was aimed at reviewing progress on the under-construction Tarbela 5th Extension Hydropower Project (T5 HPP) and witness testing and commissioning of Low Level Outlet (LLO) of Tarbela 4th Extension Hydropower Project (T4 HPP). Chairman IRSA Amjad Saeed, Members of IRSA Technical Committee and WAPDA's Member Water and Member Power also accompanied him during the visit.
At T5 HPP, the Chairman was briefed about the component-wise progress achieved so far. These included Intake Structure, Connecting Tunnel, Penstock and LLO, Power House, Tailrace Culvert, Tailrace Canal and Swit...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.