
Mumbai, Nov. 20 -- ACME Solar Holdings has signed a Power Purchase Agreement (PPA) with NTPC for a 150 MW hybrid renewable energy project at a tariff of Rs. 3.21 per unit. The Inter-State Transmission System (ISTS)-connected project will be developed across Bhadla in Rajasthan, Jambkhabalia in Gujarat and Mandsaur in Madhya Pradesh under NTPC's Hybrid-IV tranche.
The Central Electricity Regulatory Commission (CERC) has adopted the tariff for the project. The facility will combine solar and wind generation with energy storage solutions, allowing it to provide a more reliable electricity supply throughout the day and support buyers during peak demand periods.
ACME Solar has secured Central Transmission Utility connectivity for the project at Jambkhabalia and Mandsaur. The company said the combination of renewable generation and storage would support its focus on supplying reliable clean power while addressing changing energy requirements in India.
Following the agreement, ACME Solar's under-construction portfolio with signed PPAs has increased to 5,080 MW. Its total contracted capacity under construction stands at 5,380 MW, while its overall contracted portfolio is 8,370 MW across solar, battery energy storage systems (BESS), firm and dispatchable renewable energy (FDRE), hybrid and wind power projects.
The company has an operational capacity of around 3,190 MW and 5.90 GWh of battery energy storage capacity. Its in-house engineering, procurement and construction (EPC) and operations and maintenance (O&M) divisions manage project development and plant operations. Shares of ACME Solar Holdings gained nearly 2 per cent during intraday trading and have risen nearly 11 per cent over the past three months, 50 per cent over six months and 74 per cent year to date.
Published by HT Digital Content Services with permission from Construction World.