Mumbai, March 9 -- The scope of work includes supply, transportation, trenching, laying, backfilling, horizontal directional drilling, HDPE pipe insertion, blowing, jointing, and termination of optical fiber cable (OFC). The project is scheduled to be completed by 5 March 2027.
The order is purely domestic in nature and does not involve any promoter, promoter group, or related party. The company stated that the contract will be executed as per standard procedures.
RailTel Corporation of India was incorporated in 2000, with the objective of creating nationwide broadband and VPN services, telecom, and multimedia networks to modernize the train control operation and safety system of Indian Railways.
The company's standalone net profit dec...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.