Mumbai, April 6 -- The company has received a letter of acceptance from the Superintending Engineer, PMGSY Circle, Public Works Department (PWD), Lucknow.
The project involves the design, engineering, and construction of a convention centre with a capacity of 10,000 people at Vrindavan Yojna, Sector-15, in Lucknow, Uttar Pradesh, and will be executed in an EPC mode.
The contract is to be executed within 24 months.
J. Kumar Infraprojects undertakes construction of metro infrastructure, elevated corridors/flyovers, roads and road tunnels, civil works, and water infrastructure. The company had reported a 17.12% fall in consolidated net profit to Rs 82.85 crore on an 11.81% fall in revenue to Rs 1,311.24 crore in Q3 FY26 over Q3 FY25.
The...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.