ACME Solar commissions 63.78 MW / 255.120 MWh BESS component of NHPC FDRE project in Jaisalmer
Mumbai, Nov. 26 -- ACME Solar Holdings, through its wholly-owned subsidiary i.e. ACME Hybrid Urja, has commissioned discharge Capacity of 63.78 MW / 255.120 MWh (Installed capacity: 63.78 MW / 300.00 MWh) out of 280 MW/1120 MWh (Installed capacity: 280 MW/ 1316 MWh) of the Battery Energy Storage System (BESS) component of the NHPC FDRE Power Project located at Village-Mehar Nagar, Tehsil-Pokaran, District-Jaisalmer, Rajasthan on 25 November 2026.
Published by HT Digital Content Services with permission from Capital Market....
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.