MP CM performs bhoomi pujan of Rs 5,017 cr Ujjain-Jaora Greenfield 4-lane corridor project, targets completion before Simhastha 2028
Ujjain, July 10 -- Madhya Pradesh Chief Minister Mohan Yadav on Friday performed the bhoomi poojan for the Rs 5,017 crore Ujjain-Jaora Greenfield Four-Lane Corridor, describing it as a major infrastructure project that will strengthen connectivity, boost economic growth in the Malwa region and support preparations for Simhastha-2028.
Addressing a public gathering on the occasion, the Chief Minister said the 98.73-kilometre corridor would serve as a direct link between Ujjain and the Delhi-Mumbai Expressway while improving connectivity across Ujjain, Ratlam and neighbouring districts.
"The Ujjain-Jaora Greenfield Corridor is not merely a highway but a new growth engine for the overall development and economy of the Malwa region. It will ...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.