Maharashtra CM Devendra Fadnavis inspects ongoing construction of Mumbai Coastal Road project
Mumbai, June 14 -- Maharashtra Chief Minister Devendra Fadnavis on Sunday inspected the ongoing construction work of the Mumbai Coastal Road's Versova-Dahisar stretch.
Speaking to reporters, Chief Minister Fadnavis stated that the Mumbai Coastal Road project is expected to be completed by October-November or December 2028.
"... This will provide great relief to Mumbai. 60% of Mumbai's traffic goes directly via the Western Expressway, and to reduce the pressure on it, we are preparing a signal-free road from Nariman Point to Bhayandar. Our effort is that this entire project will be completed by October-November or December 2028," said CM Fadnavis.
The Mumbai Coastal Road is a 29.2-kilometre-long, toll-free, eight-lane expressway running...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.