Karachi plunges into power crisis as K-Electric announces phased load shedding amid LNG shortage
Karachi, Oct. 10 -- Karachi is bracing for further electricity disruptions after K-Electric announced phased power cuts across the city, with pressure on its power network reportedly increasing due to overloading and a shortage of liquefied natural gas (LNG), as reported by ARY News.
According to ARY News, the decision to introduce scheduled outages has raised concerns among residents already grappling with unreliable electricity supplies in Karachi. The utility has reportedly planned one-hour power cuts in different phases, while feeders connected to several grid stations have been switched off, disrupting electricity supplies across multiple neighbourhoods. Several parts of Karachi have experienced outages as the power distribution sys...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.