Hanoi, Nov. 26 -- The Thang Long Project Management Unit held a signing ceremony on November 25 for Contract Package TV-02, covering consultancy services for surveys and the preparation of a feasibility study report, including the Front-End Engineering Design (FEED) and bidding documents, for the North-South high-speed railway project. Speaking at the ceremony, Deputy Minister of Construction Bui Xuan Dung stressed that this is the first time Vietnam has undertaken a particularly large-scale high-speed railway project with highly complex technical and technological requirements.

During the investment preparation phase, surveys and the preparation of the feasibility study report, together with FEED, play a pivotal role in directly determi...