Hanoi approves 1/500-scale plan for 35.04-km Ta Hong Landscape Boulevard
Hanoi, Nov. 25 -- The Hanoi People's Committee has approved a 1/500-scale plan for the 35.04-km Ta Hong Landscape Boulevard, which passes through eight wards and communes.
The road will carry six motor-vehicle lanes on its mainline, reach a maximum width of 73.5m and include eight interchanges with bridges along the route.
The Hanoi Urban Planning Institute prepared the plan in November 2026, which was reviewed by the municipal Department of Construction.
The route starts at the Hong Ha Bridge interchange in Me Linh commune and ends at the Hanoi boundary in Bat Trang commune, passing Yen Lang, Me Linh, Thien Loc, Vinh Thanh, Dong Anh, Bo De, Long Bien and Bat Trang. It fits the Hanoi Capital Master Plan's 100-year vision and the adjust...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.