GENEVA, April 7 -- LG ENERGY SOLUTION, LTD. (Tower1 108, Yeoui-daeroYeongdeungpo-guSeoul 07335), 주식회사 엘지에너지솔루션 (서울특별시영등포구여의대로 108, 타워1) filed a patent application (PCT/KR2025/014818) for "METHOD FOR MANUFACTURING ELECTRODE FOR LITHIUM SECONDARY BATTERY, ELECTRODE FOR LITHIUM SECONDARY BATTERY MANUFACTURED THEREBY, LITHIUM SECONDARY BATTERY COMPRISING SAME, AND TRANSFER LAMINATE FOR PRE-LITHIATION" on Sep 23, 2025. With publication no. WO/2026/071654, the details related to the patent application was published on Apr 02, 2026.

Notably, the patent applicat...