WASHINGTON, Aug. 26 -- Department Of Energy has issued a notice called: Southwestern Power Administration; Robert D. Willis Hydropower Project-Rate Order No. SWPA-88.
The notice was published in the Federal Register on Aug. 26 by , .
Summary: The Acting Administrator of the Southwestern Power Administration (Southwestern) has confirmed, approved and placed into effect on an interim basis Rate Order No. SWPA-88 (Rate Order), which provides the rate schedule Wholesale Rates for Hydro Power and Energy at Robert D. Willis Hydropower Project(RDW-23). This new rate schedule for the Robert D. Willis Hydropower Project (Robert D. Willis) replaces the existing power rate under Rate Schedule RDW-15 which expires on September 30, 2025. Rate Schedule...