Jammu, June 26 -- 140-feet Bailey Bridge reconnects remote region ahead of Yatra
Jammu Tawi, Jun 25 : In a major infrastructure achievement showcasing engineering excellence and rapid response capability, the Border Roads Organisation (BRO) has restored road connectivity between Gulabgarh and Machail by operationalizing a 140-foot Triple Double Reinforced Bailey Bridge at Chishoti in Kishtwar district of Jammu and Kashmir.
According to the details available, the restoration marks the end of a prolonged disruption caused by the devastating cloudburst of 14 August 2025, which washed away the existing bridge at Chishoti and severed the only road link to the remote Machail region.
The newly constructed bridge was virtually inaugurated and de...