United States, Aug. 25 -- MGE Engineering Inc., Sacramento, California, was awarded a $10,188,308 firm-fixed-price contract for levee and floodwall design of reaches two and three of the Pajaro River, with a total cumulative face value of $11,707,286 if all options are exercised.Bids were solicited via the internet with five received. Work will be performed in Watsonville, California, with an estimated completion date of Feb. 26, 2031. Fiscal 2022 civil flood control and coastal emergencies funds in the amount of $10,188,308 were obligated at the time of award.U.S. Army Corps of Engineers, San Francisco, California, is the contracting activity (W912P7-26-C-A023).
Published by HT Digital Content Services with permission from Pivotal Sources...