M/S. Raiyan Construction secures contract for Changing of pipe line to prevent damping from all duct wall and replacing new plaster and painting works at J; CC casting at drain approan adjacent to main building; Construction of low height boundary wall at main gate;construction of guide wall and barriar to control traffic movement at campus;Cleaning works of all gardens, painting and plastering works of guidewall and grill repair at garedn; Cleaning and renovation works of all drains; earth filling at low land area at front and back site, level dressing and arboriculture works; Painting works at outer site of J blcok including other civil sanitary repair works at Rangpur Medical and Hospital.
Bangladesh, Aug. 20 -- Bangladesh based M/S. Raiyan Construction has secured contract from Public Works Department (PWD) for Changing of pipe line to prevent damping from all duct wall and replacing new plaster and painting works at J; CC casting at drain approan adjacent to main building; Construction of low height boundary wall at main gate;construction of guide wall and barriar to control traffic movement at campus;Cleaning works of all gardens, painting and plastering works of guidewall and grill repair at garedn; Cleaning and renovation works of all drains; earth filling at low land area at front and back site, level dressing and arboriculture works; Painting works at outer site of J blcok including other civil sanitary repair works at...
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.