Bangladesh, Aug. 20 -- Bangladesh based M/S. Brothers Foundry Construction has secured contract from Bangladesh Water Development Board (BWDB) for Discharge measurement & Triangulation work at Gorai Railway Bridge Station (99) Gorai River (42 ) (Medium River) at Gorai Railway Bridge Station (99) Gorai River (42) of Bheramara Hydrology Section of Pabna Hydrology Sub-Division under Northern Hydrology Measurement Division, BWDB, Pabna during the financial year 2026-2027. (to be held on 01-07-2026 to 31-12-2026) . The value of the contract is worth 208711.12 BDT .
Published by HT Digital Content Services with permission from Pivotal Sources....