Bangladesh, Oct. 7 -- Bangladesh based M/S Zaman Brothers has secured contract from Bangladesh Water Development Board (BWDB) for Remaining work of "Construction of Flood Wall at Charkanai Area of Habilaishdwip Union in between Km 0.00 and Km 1.00 (Embankment Chainage from Km. 3.220 to Km. 3.830 =610.00m. & from Km. 3.865 to Km. 4.155 =290.00m.) Total = 900.00m" (120 meter Bank protection work) along the Right Bank of Boalkhali River in-connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Habilaishdwip Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram.. The value of the contract is worth 36743375.12 BDT.
Published by HT Digital Content Service...