DPWH restores load capacity of Biliran Bridge
TACLOBAN CITY, July 23 -- The Department of Public Works and Highways (DPWH) announced on Thursday that the Biliran Bridge has been restored to its original 15-ton maximum allowable load capacity and is now open to all types of vehicles.
DPWH Biliran district engineer Irwin Antonio said the lifting of the previous vehicle-type restrictions followed the completion of the replacement of the bridge's expansion joints, allowing the structure to return to its prescribed load capacity before the bridge-swaying incident on Dec. 23, 2024.
The Biliran Bridge serves as a vital transportation link and the only road connection between Biliran province and neighboring Leyte Island.
"All types of vehicles are now permitted to cross the bridge, provi...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.