
Kolkata, Nov. 24 -- Panic gripped the daily commuters near Sealdah station on Tuesday after a portion of the railway track caved in following the collapse of a decades-old underground drainage channel in the Sealdah South section.
The train movement in the section however, was not hampered as the affected track was used as a loop line towards the South section carshed.
The incident took place around 8:30 am in the Sealdah South section during the peak morning rush hour. According to preliminary assessments, the structural failure of the aging drainage canal beneath the tracks caused the earth to give way, leaving a stretch of the rail line suspended over a crater. An underground water supply pipeline running parallel to the drain also ruptured in the collapse, flooding the immediate area.
It has been learnt that the portions of the underground drainage canal had reportedly begun sinking on Sunday, with the soil gradually eroding over the next 48 hours before giving way beneath the weight of the rail infrastructure on Tuesday morning.
Senior engineers from Eastern Railway, alongside officials from the Kolkata Municipal Corporation (KMC), rushed to the spot to assess the damage.
Joint restoration work is currently underway to repair the ruptured water pipeline, rebuild the collapsed drainage culvert, and relay the sunken track. Authorities have cordoned off the affected zone and expect full restoration of the loop line once the ground is stabilised.
Published by HT Digital Content Services with permission from Millennium Post.